Yu LIU. Performance Optimization Strategy of Coal-fired Units Based on Zhuhai Power Station[J]. SOUTHERN ENERGY CONSTRUCTION, 2020, 7(S1): 78-81. doi: 10.16516/j.gedi.issn2095-8676.2020.S1.015
Citation:
|
Yu LIU. Performance Optimization Strategy of Coal-fired Units Based on Zhuhai Power Station[J]. SOUTHERN ENERGY CONSTRUCTION, 2020, 7(S1): 78-81. doi: 10.16516/j.gedi.issn2095-8676.2020.S1.015
|
Performance Optimization Strategy of Coal-fired Units Based on Zhuhai Power Station
- Received Date: 2019-07-31
- Rev Recd Date:
2019-08-20
- Publish Date:
2020-08-31
-
Abstract
[Introduction]In view of the inferior position of coal-fired units in the power market competition compared with other types of power generating units, this paper, based on the situation of Zhuhai Power Plant, explores the control strategies of the units themselves and the ways to reduce production costs from the modification of external equipment, so as to improve the performance and efficiency of the units and obtain greater economic benefits. Method Combining to the current development level of thermal power technology and market requirements, feasibility analysis was carried out in three aspects: coordinated control parameters optimization, installation of energy storage system and heating converted project, and their optimization methods and necessary conditions were listed. Result According to the current practice results of these technologies in various power stations, it is concluded that the optimization of the above-mentioned methods according to the actual situation of the units can reduce the generation cost, significantly improve the unit performance and its competitiveness. Conclusion The optimization strategy discussed in this paper can effectively improve the current predicament of coal-fired units. It can not only improve the safety and reliability of the units in operation,but also ensure that the units occupy a place in the fierce market competition. It has practical guiding significance for all coal-fired units.
-
References
[1]
|
刘海喆,田亮.主汽压力控制品质与燃料量变化约束关系定量分析 [J].南方能源建设,2018,5(3):48-55. |
[2]
|
程辉,苗国耀.基于大滞后控制技术的1 000 MW超超临界机组过热及再热汽温优化控制 [J].自动化技术与应用,2016,35(7):9-13+18.
CHENGH, MIAOG Y. The superheating and reheating steam temperature optimization control of 1 000 MW ultra-supercritical unit based on long lag technology [J]. Automation Technology and Application,2016,35(07):9-13+18. |
[3]
|
孙磊,吕剑虹,魏静.大型火电机组自动发电控制优化控制策略的研究 [J].江苏电机工程,2008(1):5-8.
SUNL, LVJ H, WeiJ. Research on optimal control strategy of automatic generation control for large thermal power units [J].Jiangsu Electric Power Electrical Engineering,2008(1):5-8. |
[4]
|
华志刚,吕剑虹,张铁军.状态变量-预测控制技术在600 MW机组再热汽温控制中的研究与应用 [J].中国电机工程学报,2005(12):103-107.
HUAZ G, LVJ H, ZHANGT J. Research and application of state variable-predictive control technology in rehearted steam temperature control of 600 MW units [J].Chinese Journal of Electrical Engineering,2005(12):103-107. |
[5]
|
叶季蕾,薛金花,王伟,等.储能技术在电力系统中的应用现状与前景 [J].中国电力,2014,47(3):1-5.
YEJ L, XUEJ H, WANGW, et al. Application status and prospect of energy storage technology in power system [J].Chinese Electrical Power,2014,47(3):1-5. |
[6]
|
饶云堂,朱军.大容量储能技术在火力发电厂中的应用探讨 [J].中国电业(技术版),2015(10):62-65.
RAOY T, ZHUJ.Discussion on the application of large capacity energy storage technology in thermal power plant [J].China Electric Industry,2015(10):62-65. |
-
-